# Operator Pursuit Stack — What Terry Pursues (and What to Skip)
**Effective:** 2026-06-17 · **Machine-readable mirror:** `data/pursuit-stack.json` · **Frontend:** `/owner/hub` + `/pipeline`

This is the conversation on paper. If it is not here, it should not be on the hub.

---

## BLUF — your next 7 days

| Priority | What | Deadline | Verdict |
|----------|------|----------|---------|
| **1** | **JTIC2S RFI** — email v10.zip | **Mon 23 Jun, 1:00 PM ET** | **SEND** (package ready) |
| **2** | **DLA26BZ02-NV007** — STRIKE AI / OT critical infrastructure | **Tue 24 Jun, noon ET** | **SUBMIT** Phase I |
| **3** | **DLA26BZ02-NV006** — AI-assisted RMF pre-adjudication | **Tue 24 Jun, noon ET** | **SUBMIT** Phase I |
| **4** | **SPIN-TX** form | Rolling | **SEND** (~20 min) |
| **5** | **Release 3 TPOC questions** (DoN topics you want) | **Mon 23 Jun** | Questions only — submit proposals starting **24 Jun** |

**Release 2 closes the same day Release 3 opens (24 Jun).** R2 is your last chance for NV006/NV007 this cycle.

---

## Why these two SBIRs for Release 2 (not three random topics)

### 1. DLA26BZ02-NV007 — STRIKE AI (OT / critical infrastructure)

- **Phase I:** yes — $100K, 12 months.
- **Fit:** Commander's intent → machine-speed, deconflicted cyber + physical response plan. That is ATLAS COA generation, COP alert-intel, cyber engines, and homeland/EM dual-use — not a new invention.
- **Win angle:** Human-on-the-loop with AGOS audit; DDIL for degraded comms; dual-use water/power/grid narrative for CISA/USNORTHCOM lane.

### 2. DLA26BZ02-NV006 — AI-assisted RMF pre-adjudication

- **Phase I:** yes — $100K, 12 months.
- **Fit:** Topic wants artifact analysis with **human attestation** and traceable findings. That is GREEN/AMBER/RED + citation-required AGOS — your core discriminator.
- **Win angle:** Complements NV005 (cyber agents) without duplicating it; positions ISS for DLA enterprise cyber governance.

### Optional stretch — OSW26BZ02-DV004 (game-theoretic COA / wargaming)

- **131A fit is real** — deliberate targeting is COA generation under adversary uncertainty.
- **Catch:** DSIP lists this as **Direct to Phase II only**. You need a white paper proving mature prototype + quantified performance vs expert planners. Pursue **only after** NV006 and NV007 are certified, unless you explicitly want a D2P2 shot this week.

### Do not submit again

- **DLA26BZ02-NV005** — already submitted Release 1.

---

## Release 3 — what to eye before 23 Jun (TPOC window)

Send 2–3 questions per topic to topic authors before **23 Jun**. Draft full proposals when portal opens **24 Jun** through **22 Jul noon ET**.

| Tier | Topic | Why |
|------|-------|-----|
| **A** | **DON26BX03-NP002** — C-UAS CSO | Open-architecture C-UAS; OT path; DITS + ACES proof |
| **A** | **DON26BZ03-NV059** — Zero trust combat systems data/access | AGOS, sovereign LLM, audit chains |
| **B** | Maritime anomaly / multi-band discovery / predictive tracking / terminal defense / adaptive sensors / embarked data transfer | Scan DSIP on 24 Jun — **submit every GREEN**, skip RED (hardware-only, TS/SCI, materials) |
| **B** | **AFWERX R3** (10 topics) | Filter: C-UAS, C2, contested logistics, runtime autonomy, disaster preparedness — reuse NV008 draft if autonomy returns |

**No arbitrary cap of 3** — operator preference is continuous submission of GREEN topics, not spreading across 25 weak fits.

---

## July stack (after R2/R3 wave)

| Pursuit | Deadline | Verdict |
|---------|----------|---------|
| NATO **DIANA 2027** | 3 Jul | Pursue — refresh multidomain sensing proposal |
| **DARPA DISCORD** | 9 Jul | Pursue — decision intel; overlaps DV004 theme but different vehicle |
| **NG FedTech accelerator** | 1 Jul | Conditional — software/sustainment angle only |
| **SOFWERX UxSAI** | 29 Jun | Conditional — only if R2 done |
| **Release 4 SBIR** | Opens 22 Jul | Watch — scan after R3 submits |

---

## Skip list (stop wasting cycles)

- USSOCOM SOFGSD, S²MARTS MTSD (unless prime invites sub), Leidos MCiS greenfield, Army MAPS without sponsor
- Scout cards and sub-to-prime OTAs without membership unless a sponsor appears

---

## Where artifacts live

| Item | Path |
|------|------|
| R2 NV007 proposal | `docs/proposals/SBIR_R2_DLA26BZ02-NV007_SUBMISSION.docx` |
| R2 NV006 proposal | `docs/proposals/SBIR_R2_DLA26BZ02-NV006_SUBMISSION.docx` |
| R2 DV004 D2P2 outline | `docs/proposals/SBIR_R2_OSW26BZ02-DV004_D2P2_OUTLINE.md` |
| JTIC2S zip | `docs/proposals/JTIC2S-RFI-v10.zip` |
| This stack (JSON) | `data/pursuit-stack.json` |

---

## Operator sign-off (fill when locked)

- [ ] I agree: R2 = **NV007 + NV006** by 24 Jun noon ET
- [ ] I will send **JTIC2S** by 23 Jun 1300 ET
- [ ] Release 3 Tier A topics locked: _______________
- [ ] Optional DV004 D2P2: Yes / No
