{"module":"TACTICAL-EDGE-SPINE","version":"1.0.0","doctrine":"Waze-model crowd-sourced SA — every soldier/vehicle/sensor contributes; edge computes; PACE routes; DDIL persists.","scenario":"/scenario-worst-day","pass":true,"degradedPass":true,"silentFailureCount":0,"failedSteps":[],"stepsPassed":7,"stepsTotal":7,"readinessPct":100,"ms":3102,"steps":[{"id":"esms-cot-edge","pass":true,"detail":"ESMS detect accepted; CoT path live","ms":95},{"id":"ddil-store-forward","pass":true,"detail":"DDIL queue + sync on degraded link","ms":316},{"id":"tak-directory","pass":true,"detail":"TAK yellow pages directory online","ms":755},{"id":"force-protection","pass":true,"detail":"Worst-day force protection chain","ms":1623},{"id":"maritime-poseidon","pass":true,"detail":"Maritime POSEIDON cluster posture","ms":176},{"id":"pace-routing","pass":true,"detail":"PACE pick: MESH","ms":0},{"id":"mission-spine","pass":true,"detail":"Longitudinal mission spine prove-thread","ms":134}],"surfaces":{"status":"/api/tactical-spine/status","paceRoute":"POST /api/tactical-spine/pace/route","prove":"/api/prove/touch/worst-day-spine","worstDayScenario":"/scenario-worst-day","takBridge":"/tak-bridge","gpsDenied":"/gps-denied"},"honestNote":"Proves integrated spine wiring in-process — not a live field exercise. Human-in-loop on lethal effects."}